Road Closures

The following is a listing of temporary right of way closures which can include: full or partial road closures, full or partial sidewalk closures, full or partial shoulder and boulevard closures and full or partial bike lane closures. Closure or occupancy of other space in the right of way is also possible.

The closures in this list may be a result of construction, moving, filming, parade or other special event or reason. The list does not include unscheduled or emergency closures.

The closures in this list may be a result of construction, moving, filming, parade or other special event or reason.

This list does not include unscheduled or emergency closures.

 

  • 22-38 Morton Ave E (between West St and Wayne Gretzky Pkwy)

    December 9th 2025 to December 30th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Bucket Truck - Aerial Work (Construction)

    Number of Days Closed: 22
    Occupancy Limits: Roadway - Partially Closed Onerlane closed for 2 days during December 10th and December 31st
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 33 Erie Ave (between Market Street and Clarence St)

    December 9th 2025 to December 11th 2025
    Time of Occupancy: 8:30am - 3:30pm
    New service completion (Construction)

    Number of Days Closed: 3
    Occupancy Limits: Roadway - Partially Closed One Lane Closed
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • a lane on Gilkison St (between Edge St and Mt Pleasant St) and a lane on River Rd (between Baldwin Ave and Brikett Ln) will be closed

    December 7th 2025 to December 21st 2025
    Time of Occupancy: 7:00am - 6:00pm
    to clean a sanitary siphon (Construction)

    Number of Days Closed: 15
    Occupancy Limits: Roadway - Partially Closed One lane closed at each location
    Ward: Ward 1;Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 192-196 Market St (between Grey St and Marlborugh St)

    November 30th 2025 to December 30th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Cable repair (Construction)

    Number of Days Closed: 31
    Occupancy Limits: Shoulder 2-3 parking stalls will be closed in front of 192-196 Market St (between Grey St and Marlborugh St) for 1-2 days between December 1st 8:00 am to December 31st 6:00 pm
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • 40 to 50 Kent Rd

    November 11th 2025 to December 11th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Ped to Ped Cable Replacement (Construction)

    Number of Days Closed: 31
    Occupancy Limits: Roadway - Partially Closed One lane closed
    Ward: Ward 2
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • West St (between Dundas St and Clarence St) - West Sidewalk Closed November 1 2025 - December 30 2026

    October 31st 2025 to December 29th 2026
    Time of Occupancy: 8:00am 8:00am
    247–253 West Street Full site redevelopment and new building construction. (Construction)

    Number of Days Closed: 425
    Occupancy Limits: Sidewalk West St (between Dundas St and Clarence St) - West Sidewalk Closed
    Ward: Ward 3
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 144 KING GEORGE RD

    December 11th 2025 to December 18th 2025
    Time of Occupancy: 8:30am - 5:30pm
    PLACE NEW CONDUIT AND CABLE (Construction)

    Number of Days Closed: 8
    Occupancy Limits: Roadway - Partially Closed One Left curb lane closed
    Ward: Ward 2;Ward 3
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 9 Garden Ave (between Grey St and Colborne St)

    October 26th 2025 to December 18th 2025
    Time of Occupancy: 7:00am to 4:30pm
    Installation of new underground pipes (Construction)

    Number of Days Closed: 54
    Occupancy Limits: Roadway - Fully Closed A full road closure will be in effect on 9 Garden Ave (between Grey St and Colborne St) for 5 days between October 27th and November 7th. A full road closure will be in effect in front of 9 Garden Ave for 1 day during the end of November/beginning of De
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • 247 Stanley St (Between Campbell St and Elgin St)

    October 5th 2025 to December 9th 2025
    Time of Occupancy: 8:00am - 4:00pm
    preventative maintenance work on the gas mains & services (Construction)

    Number of Days Closed: 66
    Occupancy Limits: Roadway - Partially Closed One lane closed for one day between Oct 6 and Nov 6
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • Darling Street, in front of 32 Bridge Street. Bridge Street, between Darling and Dalhousie

    August 26th 2024 to July 30th 2026
    Time of Occupancy: 7:00am-7:00pm
    New Construction - 4 Storey Apartment Building (Construction)

    Number of Days Closed: 704
    Occupancy Limits: Parking Lane and Sidewalk Closed In front of 32 Bridge Street, on the Darling Street side. Along the side of 32 Bridge Street, between Darling Street and Dalhousie Street.
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • Lynden Road and Garden Ave

    August 17th 2025 to December 30th 2025
    Time of Occupancy: 7:00AM to 11:55PM
    Lynden Road and Garden Ave will experience increased traffic as a result of a detour from Johnson Road. (Construction)

    Number of Days Closed: 136
    Occupancy Limits: Other Lynden Road, between Johnson Road and Garden Ave, and Garden Ave, between Lynden Road and Johnson Road.
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 38 Market Street

    June 29th 2025 to December 21st 2025
    Time of Occupancy: 8:00am-4:30pm
    Exterior Building Facade Repairs. Pedestrian accessible scaffolding will be installed at 38 Market Street (Market Street and Dalhousie Street sides of the building, between June 30 8:00am-October 30, 2025 4:30pm. Installation and removal will each take t (Construction)

    Number of Days Closed: 176
    Occupancy Limits: Sidewalk Market Street and Dalhousie Street sidewalks of 38 Market Street.
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined

The closures in this list are the result of City Construction projects. Construction projects being completed by other entities, including private cable or phone companies are not included in this list.

This list does not include unscheduled or emergency closures.

 

  • Tutela Heights Permanent Road Closure

    Tutela Heights Road - 370m east of Davern Rd. at the City boundary.
    September 15th 2025 to December 30th 2026
    Road Reconstruction
    Project Lead:Adam Quibell
    Ward: Ward 1
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • Downtown Revitalization - Phase 1

    Brant Avenue Colborne Street Dalhousie Street Hill Street Icomm Drive - Brant Avenue (Dalhousie Street to Colborne Street) Colborne Street (Brant Avenue to King Street) Dalhousie Street (Brant Avenue to Bridge Street) Icomm Drive (Colborne Street to Clarence Street South) Hill Street (Icomm Drive to Water Street)
    September 14th 2025 to September 3rd 2026
    Road, Sewer and Watermain Construction
    Project Lead:Omar Ismael
    Ward: Ward 5
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Cumberland Street - At the intersection of Cumberland St. and Hamilton Ave.
    September 21st 2025 to December 30th 2025
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 4
    Construction Location: Roadway - Partially Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Acorn Lane - At 6 Acorn Lane At 41 Acorn Lane
    September 21st 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 3
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Ronald Street - Carene Court to Memorial Drive
    September 21st 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 3
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Kerr Avenue - Chestnut Avenue to St. Paul Avenue
    September 21st 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 2
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Hawthorne Lane - DeerPark Avenue to Woodlawn Avenue
    September 21st 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 2
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Sympactica Crescent - Brantwood Park Road to Nautical Road
    September 21st 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 4
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • 2025 Toplift and Resurfacing

    Coulbeck Street - Powerline Road to Banbury Road
    September 15th 2025 to January 29th 2026
    Road Resurfacing
    Project Lead:Nicole Talpa
    Ward: Ward 4
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • Balfour Street, Road, Sewers and Watermain Reconstruction

    Balfour Street - Balfour Street (Mount Pleasant Street to Gilkison Street)
    August 24th 2025 to June 29th 2026
    Road, Sewer and Watermain Construction
    Project Lead:Nicole Talpa
    Ward: Ward 1
    Construction Location: Roadway - Fully Closed
    Additional Information:
  • Brant's Crossing Bridge Replacement and Fordview Lookout Removal

    Colborne St W - EB Colborne St W, 10m-100m east of Gilkison St, outside lane + bus bay short duration occupancy as required.
    March 4th 2025 to January 29th 2026
    Bridges or Structures
    Project Lead:Meagan Bergman
    Ward: Ward 1;Ward 5
    Construction Location: Roadway - Partially Closed
    Additional Information:
  • Brant's Crossing Bridge Replacement and Fordview Lookout Removal

    Grand River Ave - Scarfe Ave South to Dead End
    March 4th 2025 to January 29th 2026
    Bridges or Structures
    Project Lead:Meagan Bergman
    Ward: Ward 1;Ward 5
    Construction Location: Roadway - Partially Closed
    Additional Information:
  • Brant's Crossing Bridge Replacement and Fordview Lookout Removal

    Fordview Court - Gilkison Street east to Dead End
    March 4th 2025 to January 29th 2026
    Bridges or Structures
    Project Lead:Meagan Bergman
    Ward: Ward 1;Ward 5
    Construction Location: Roadway - Partially Closed
    Additional Information:

The closures in this list are the result of construction projects being completed by entities other than the City of Brantford. This may include, but not be limited to: private cable or phone companies, private individuals or corporations, and provincial or federal government agencies.

This list does not include unscheduled or emergency closures.

 

  • Darling Street, in front of 32 Bridge Street. Bridge Street, between Darling and Dalhousie

    August 26th 2024 to July 30th 2026
    Time of Occupancy: 7:00am-7:00pm
    New Construction - 4 Storey Apartment Building (Construction)

    Number of Days Closed: 704
    Occupancy Limits: Parking Lane and Sidewalk Closed In front of 32 Bridge Street, on the Darling Street side. Along the side of 32 Bridge Street, between Darling Street and Dalhousie Street.
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • 38 Market Street

    June 29th 2025 to December 21st 2025
    Time of Occupancy: 8:00am-4:30pm
    Exterior Building Facade Repairs. Pedestrian accessible scaffolding will be installed at 38 Market Street (Market Street and Dalhousie Street sides of the building, between June 30 8:00am-October 30, 2025 4:30pm. Installation and removal will each take t (Construction)

    Number of Days Closed: 176
    Occupancy Limits: Sidewalk Market Street and Dalhousie Street sidewalks of 38 Market Street.
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • Lynden Road and Garden Ave

    August 17th 2025 to December 30th 2025
    Time of Occupancy: 7:00AM to 11:55PM
    Lynden Road and Garden Ave will experience increased traffic as a result of a detour from Johnson Road. (Construction)

    Number of Days Closed: 136
    Occupancy Limits: Other Lynden Road, between Johnson Road and Garden Ave, and Garden Ave, between Lynden Road and Johnson Road.
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 247 Stanley St (Between Campbell St and Elgin St)

    October 5th 2025 to December 9th 2025
    Time of Occupancy: 8:00am - 4:00pm
    preventative maintenance work on the gas mains & services (Construction)

    Number of Days Closed: 66
    Occupancy Limits: Roadway - Partially Closed One lane closed for one day between Oct 6 and Nov 6
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 9 Garden Ave (between Grey St and Colborne St)

    October 26th 2025 to December 18th 2025
    Time of Occupancy: 7:00am to 4:30pm
    Installation of new underground pipes (Construction)

    Number of Days Closed: 54
    Occupancy Limits: Roadway - Fully Closed A full road closure will be in effect on 9 Garden Ave (between Grey St and Colborne St) for 5 days between October 27th and November 7th. A full road closure will be in effect in front of 9 Garden Ave for 1 day during the end of November/beginning of De
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • West St (between Dundas St and Clarence St) - West Sidewalk Closed November 1 2025 - December 30 2026

    October 31st 2025 to December 29th 2026
    Time of Occupancy: 8:00am 8:00am
    247–253 West Street Full site redevelopment and new building construction. (Construction)

    Number of Days Closed: 425
    Occupancy Limits: Sidewalk West St (between Dundas St and Clarence St) - West Sidewalk Closed
    Ward: Ward 3
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 40 to 50 Kent Rd

    November 11th 2025 to December 11th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Ped to Ped Cable Replacement (Construction)

    Number of Days Closed: 31
    Occupancy Limits: Roadway - Partially Closed One lane closed
    Ward: Ward 2
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • 192-196 Market St (between Grey St and Marlborugh St)

    November 30th 2025 to December 30th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Cable repair (Construction)

    Number of Days Closed: 31
    Occupancy Limits: Shoulder 2-3 parking stalls will be closed in front of 192-196 Market St (between Grey St and Marlborugh St) for 1-2 days between December 1st 8:00 am to December 31st 6:00 pm
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: Yes undefined
  • a lane on Gilkison St (between Edge St and Mt Pleasant St) and a lane on River Rd (between Baldwin Ave and Brikett Ln) will be closed

    December 7th 2025 to December 21st 2025
    Time of Occupancy: 7:00am - 6:00pm
    to clean a sanitary siphon (Construction)

    Number of Days Closed: 15
    Occupancy Limits: Roadway - Partially Closed One lane closed at each location
    Ward: Ward 1;Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 33 Erie Ave (between Market Street and Clarence St)

    December 9th 2025 to December 11th 2025
    Time of Occupancy: 8:30am - 3:30pm
    New service completion (Construction)

    Number of Days Closed: 3
    Occupancy Limits: Roadway - Partially Closed One Lane Closed
    Ward: Ward 5
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 144 KING GEORGE RD

    December 11th 2025 to December 18th 2025
    Time of Occupancy: 8:30am - 5:30pm
    PLACE NEW CONDUIT AND CABLE (Construction)

    Number of Days Closed: 8
    Occupancy Limits: Roadway - Partially Closed One Left curb lane closed
    Ward: Ward 2;Ward 3
    Accessibility Details: None given.
    Parking Restrictions: No undefined
  • 22-38 Morton Ave E (between West St and Wayne Gretzky Pkwy)

    December 9th 2025 to December 30th 2025
    Time of Occupancy: 8:00am - 6:00pm
    Bucket Truck - Aerial Work (Construction)

    Number of Days Closed: 22
    Occupancy Limits: Roadway - Partially Closed Onerlane closed for 2 days during December 10th and December 31st
    Ward: Ward 4
    Accessibility Details: None given.
    Parking Restrictions: No undefined

The closures in this list are the result of special events occurring within the City of Brantford. Special Event closures appear on this list a maximum of 7 days prior to the start of the closure.

This list does not include unscheduled or emergency closures.

  • No projects at this time.

Interactive Map

Use the City’s interactive map to stay informed about current road closures and active construction projects.

Right-of-Way Activity Permit

On April 27th, 2021 City Council approved a new Right-of-Way Activity Policy, Public Works-023.  The City of Brantford is committed to implementing efficient policies and practices that ensure the health and safety of the public.  This new policy reduces the number of permits required, eliminates duplicate or triplicate document submissions and streamlines the applicable fee structure. All fees and charges are in accordance with the Fees and Charges By-law.

All applications for the Right-of-Way Activity Permit should be submitted using the online application available at the City’s Website June 14, 2021.

A Right-of-Way Activity Permit is required by any person, utility company or contractor performing activities within City streets right-of-way. An approved permit must be obtained prior to any work commencing.  To review full details of the Right-of-Way Activity Permit process please visit the Right-of-Way Activity page on the City’s Website.