West Brant Access Route
West Brant Access Route (Oak Park Road Extension) and Colborne Street West Environmental Assessment (EA)
The City is studying ways to improve travel in West Brant through two Environmental Assessment studies.
One study looks at a new West Brant Access Route connection between Hardy Road and Colborne Street West, and the other looks at transportation and design improvements on Colborne Street West from County Road 7 to D’Aubigny Road. Both studies are being completed as Schedule C projects under the Municipal Class Environmental Assessment (MCEA).
Current Work and Next Steps
Work is continuing in 2026 through Phases 3 and 4 of the project to develop and compare design options, understand potential impacts, and identify a recommended design.
A draft Study Design Report has been prepared. It is available for review and describes what will be studied, how the work will be done, and includes an early high-level review of options.
After the public meeting, the Study Design Report will be finalized.
Public Meeting (Public Information Centre #3)
Thank you to everyone who attended the public meeting on February 26, 2026 and shared feedback.
The following materials from the meeting are available for review:
- Conceptual rendering video to help show what the project could look like
- Presentation shared at the meeting
- Updated Study Design Report
- Technically preferred plans for both the West Brant Access Route and Colborne Street West
The Notice of Study Recommencement and PIC #3 for this project was first published on February 12, 2026.
Have your say
Share your comments or questions by March 13, 2026 to inform the current phase of consultation by visiting LetsTalkBrantford.ca/WBAR.
| About the Studies |
|
Study 1: West Brant Access Route Study 2: Colborne Street West These studies are separate, but they are happening at the same time because they are located close together and connected. |
| Study Areas |
|
The West Brant Access Route study area includes a new road connection from Hardy Road to Colborne Street West. The Colborne Street West study area runs from County Road 7 to D’Aubigny Road. The Study Area includes lands within 200 metres on both sides of the possible road locations being reviewed. |
| Reason for this Project |
|
These studies are intended to help the City:
|
| EA Process (Schedule C) |
|
This work follows the Municipal Class Environmental Assessment (MCEA) process, approved under the Ontario Environmental Assessment Act. A Schedule C EA includes five phases:
|
| Background (Phases 1 and 2 Completed) |
|
Phases 1 and 2 of the Oak Park Road Extension (OPRE) EA were completed under the MCEA. A Commencement Notice was published in June 2020, and two Public Information Centres were held:
This work is documented in the Phase 1 and 2 Summary Report (December 2021). During Phases 1 and 2, the project team reviewed seven planning alternatives across the County of Brant and the City of Brantford. The options were compared using criteria grouped into eight categories. The preferred planning solution was: The recommendation was to continue work on:
The work also recommended including:
It also identified the need to study and address potential impacts to transportation, the natural environment, noise and air quality, social and cultural features, and archaeology. In December 2021, the EA was paused while other strategies were explored. After the Alternative Transportation Strategic Review (ATSR) was completed, Council approved resuming the EA in June 2024. The project is now referred to as the West Brant Access Route. |
| Restarting the EA (2026) |
|
Building on the work completed in Phases 1 and 2, the City is continuing with Phase 3 and Phase 4 work to:
|
| Study Design Report |
|
The draft Study Design Report explains the study scope and process, including an early high-level review of options. It helps guide what will be reviewed in Phase 3 and Phase 4. After the public meeting on February 26, 2026 (Public Information Centre #3), the Study Design Report will be finalized. |
| Public Meetings (Public Information Centres) |
|
PIC #3 (February 26, 2026 - in-person)
PIC #2 (March 31, 2021 - virtual) PIC #1 (November 27, 2020 - virtual) |
| Documents and Links |
|
We Want to Hear From You
Public feedback helps the City understand local needs and concerns. Share your comments or ask questions by:
- visiting LetsTalkBrantford.ca/WBAR,
- emailing the project team, and/or
- reviewing posted materials and sending feedback.
When the study is complete, the Environmental Study Report (ESR) will be available for public and agency review.
Contacts
Email: WestBrantAccessEA@brantford.ca
Steve Taylor, P.Eng., M. Eng., P.E.
BT Engineering Inc. - Consultant Project Manager
Phone: 519-672-2222
James Clarke, C.E.T., PMP
City of Brantford - Senior Project Manager
Phone: 519-759-4150 ext. 5198
If you need information in an alternate format, or need accommodation to participate, please contact the project team at WestBrantAccessEA@brantford.ca.