St. Andrews Drive Wastewater Pumping Station PIC Notice

Notice of Public Information Centre

St. Andrews Drive Wastewater Pumping Station Upgrades

The Project

The City of Brantford’s (the City) recent Water, Wastewater and Stormwater Master Servicing Plan Update identified critical municipal infrastructure upgrades required for the St. Andrews WWPS to continue servicing an upstream catchment area consisting of a residential neighbourhood in Brantford’s Northwest Industrial Area.

The planned improvements to the St. Andrews WWPS, located on 119 St. Andrews Drive, include upgrading structural, mechanical (including new pumps) and electrical equipment and installing emergency storage as proposed by the most recent Master Servicing Plan that projected required upgrades to the City’s pumping stations up to 2051.

Project Area

Map of the St. Andrews WWPS Project Area

The Process

The City is notifying pertinent stakeholders that the St. Andrews Wastewater Pumping Station (WWPS) Upgrades project is currently undergoing the Detailed Design Phase (2023 - 2024), with Construction scheduled for 2025.

Under the “Municipal Class Environmental Assessment” (manual updated in 2023) Project Descriptions, these works are sufficiently minor to be exempt from a Screening Process or classification as a Municipal Class Environmental Assessment Schedule B or C project. However, as a matter of due diligence, project information will be made available to the public, Indigenous communities, and governmental review agencies.

Public Involvement

Public, Indigenous communities, governmental review agencies, and stakeholder groups’ input and comments are invited for incorporation into the planning and design of the upgrade project. The City would like anyone with an interest in this study to have an opportunity to provide input, which will help the project team in the decision-making process.

A Public information Centre will be held to share information regarding this study and solicit feedback. It will take place at the Walter Gretzky Municipal Golf Course (Clubhouse) on 320 Balmoral Dr., Brantford, from 4:30 pm to 6:00 pm on April 11, 2024.

This will include the issues being addressed and opportunities being considered, study findings, and the evaluation of alternatives for the St. Andrews WWPS, including the preferred recommended upgrades to the WWPS.

To stay up to date, visit the project website: brantford.ca/StAndrewsWWPS 

If you have any questions or comments regarding this study or wish to be added to the study mailing list, please contact either one of the project team representatives below.

Shahab Shafai, M.Sc., P.Eng.
City Project Manager
City of Brantford
519-759-4150 Ext. 5745
 
Joan Thompson, P.Eng.
Consultant Team Project Designer
GM BluePlan Engineering Limited
519-748-1440 Ext. 4275

Note: Information collected for the study will be used in accordance with the Municipal Freedom of Information and Protection of Privacy Act. Except for personal information, including your name, address and property location, all comments received throughout the study will become part of the public record and included in project documentation.

First Issued on March 28, 2024